You are a new engineer hired to develop the smart grid in a growing town. This town just keeps growing, and as such you’ve been given new Smart Grid technologies and need to implement them into the existing grid. You have to balance maintaining the existing grid and implementing new Smart Grid technologies to keep the customers.
Power Play was commissioned by the Peoria Park District to teach children about smart grid technology. The project was prototyped in the fall of 2020 and released in May 2021.
In this project, I did all of the UI and made the dialogue system. Along with that, I made the pop-out tool panel and connected it with the building system. I assisted with the time-cycle system and quiz system. I also helped out with the settings.
Play the game here!